单词盒子
简体 繁體

transportation programming problem

T 开头单词

基本解释

  • [机械工程]运输规划问题

英汉例句

    双语例句

  • Expected value goal programming, chance constrained goal programming model and dependent-chance goal programming model of rough transportation problem are constructed;
    建立了粗糙运输问题目标规划的期望值模型、机会约束规划模型、相关机会规划模型;
  • Then using the approach to the transportation problem in the linear programming, a network configuration with optimal current-flow and minimum line-loss can be found out.
    然后按线性规划中运输问题的解法,寻求最小线损网架的优化电流潮流,从而定出合理的线损最小网架。
  • At last transportation problem based on DCP is generalized by introducing goal programming, and transportation problem based on dependent chance goal programming is modeled.
    后又进一步推广了基于相关机会规划的运输问题,将目标规划引入,建立起基于相关机会目标规划的运输问题的数学模型。

专业释义

    机械工程

  • 运输规划问题
  • 上一篇
  • 下一篇
友情链接 词源字典 专八核心词 六级核心词 C 开头单词 数学英语 天空英语词典

站内若未声明原创,则可用作非盈利目的,但请保留出处。部分内容源自网络,若有冒犯,请来信告知

陕ICP备14005772号-17 | 词典 · www.dancibox.com